Mining operations at Mimosa platinum mine began in 1926 and two vertical shafts were sunk with trial mining starting in 1966 when 40,000t of platinum was processed. The operations were suspended in 1971 and Blore Shaft was established, from which 90,000t of ore was processed in 1975. The mining operations were further suspended in 1978.
Цааш унших